Overview
This report covers the current on-ground situation in Overseas East Sectors E, F, and G—including litigation status, villa construction progress, street-by-street observations, and present/future access routes. It also compares nearby sectors to frame market reality.
Location & Current Access
- The cluster (Sectors E, F, G) lies close to the Capital Smart City Interchange.
- A new access route (opened/closed intermittently but expected to continue) now shortens the drive from the interchange to Sector E’s starting edge to ~4.84 km (roughly 4.8–5.0 km).
- Previously, access required a longer loop via the 400-ft Boulevard → Prime-1 → Overseas East, making it ~8.5–9 km. The new route halves travel distance.
- On site, a pair of separate two-lane links now directly connect to toll booths on the motorway and onward to the Overseas East cluster, improving day-to-day mobility.
Future Access (Post-litigation scenario)
- Once land issues are cleared, Sector H—which sits beside Sectors E, F, G—is planned to connect via the 400-ft Main Boulevard and then tie back to the M-2 Motorway.
- That alignment would bring end-to-end internal travel to ~3 km, significantly improving commute times across these sectors.
Note on imagery: Google Earth for this pocket is partially outdated (some tiles last refreshed around Nov 2022), so on-ground verification remains essential.
Land Status Snapshot
- Sector E: Generally clear (non-litigated).
- Sector F: Complex—a central water body (“Dam Chowri”) bisects the tract. Land across the water body has reportedly been procured by Faisal Town Phase-2; much of the 7-Marla belt opposite the water body remains unclear/litigated. Portions of 5-Marla and 12-Marla near the water body (same side) are clearer; earthwork is ongoing but possession is not yet offered.
- Sector G: Largely litigated—estimated 60–65% shows village settlement footprints. Some segments of Park Road West, parts of Street-1, Street-5, Street-9, and a stretch of Aziz Bhatti Road are partially clear with street shaping started; most other land is still pending clearance.
Sector E – Plot Mix & Villas
- Plot inventory: Predominantly 5-Marla. A few corner plots with extra land can measure closer to 7-Marla.
- Villa belts: Villas were marketed from late-2018/2019. Today:
- Several villa streets exist: Street-1, Street-4, Street-5, Street-6, plus Lanes 1–3; additional progress along Street-7, Street-8 and adjoining service roads (30-ft ROW).
- On some streets you’ll find fully shaped rows, while adjacent rows remain half-built or not started.
- Overall, where villas were reserved, roughly ~60% of the reserved frontage shows active or historic construction; ~40% remains empty.
- Among villas that did start, only ~10–15% have reached near-final or final stage; the majority are still at grey structure or below.
- Takeaway: Sector E’s land is largely clear, but villa completion is uneven. Possession is pending for many units; some are close to handover yet owners have not taken possession.
Sector F – Plot Mix, Water Body & Villas
- Water body divides the sector; land across the water body is now associated with Faisal Town Phase-2 (visible by their stockpiling/earth signatures).
- 7-Marla (opposite water body): Not clear; litigation persists; possession not foreseeable in near term.
- 5-Marla & 12-Marla (same side as water body): Largely clear; earthwork in progress, but no handover yet.
- Villas: Along Park Road, Lane-1, and partly Lane-2:
- None appear fully completed yet; a few have first-floor slabs cast; most remain at early grey structure.
- Given villas have been sold since 2019/2020, this limited progress represents a significant delay for 12-Marla buyers.
- Implication: Sector F faces a dual challenge—land re-procurement needs (for 7-Marla opposite the water body) and slow villa advancement on clear tracts.
Sector G – Predominantly Litigated
- Only pockets along Park Road West, part of Street-1, and fragments of Streets 5 & 9 plus Aziz Bhatti Road show partial clearance and initial street cutting.
- ~60–65% of the sector still exhibits village habitation and uncleared titles.
- Recommendation: Defer build timelines; monitor for society-led land consolidation or alternate allocation options.
Street-Level Observations (Highlights)
- Sector E:
- Street-1: Active villas; 5-Marla inventory only.
- Streets-4, 5, 6: Mixed—some frontages built; others idle.
- Lanes 1–3: Villas present, but several rows remain vacant despite being earmarked for villas.
- Sector F:
- Park Road & Lane-1/2: Multiple villas at early stages; none fully delivered; a few at first-floor level.
- 7-Marla opposite the water body: Litigated.
- Sector G: Scattered clearings; majority unchanged vs older imagery—litigation persists.
Market Context Across Overseas East
- Earliest Overseas East launches for 5-Marla were in Sectors E, F, G—these have mixed to weak momentum today due to litigation and slow villa completions.
- Stronger resale/possession pockets:
- Sector A (10-Marla) – developed, positive secondary market.
- Sector B (1-Kanal) – strong prices and higher build ratio.
- Sector C (10-Marla) – stable; primarily residential plots.
- Executive Block (esp. Sector-B within Executive) – robust construction activity (~200–250 homes active), many possessions granted; most positive among mid-sizes.
- 7-Marla reality: Across the wider project (Overseas East, Central, Prime-1, Executive, etc.), only Overseas Prime-1—Sectors T & A—present 7-Marla with realistic possession; elsewhere, possession is generally not available yet.
Risks & Expectations
- Possession Delays: Many villas (esp. 12-Marla in Sector F and 5-Marla belts in Sector E) are not at handover; numerous owners are close but have not taken possession.
- Land Clearance: Sector G and parts of Sector F (7-Marla opposite water body) hinge on litigation resolution/land procurement.
- Imagery Lag: Public satellite tiles under-represent recent on-ground adjustments—site visits remain vital.
Recommendations
- Sector E (Build Now, But Vet Street):
- Land mostly clear; pick streets with visible activity (St-1, 4–6, service roads).
- For villas, run independent structural due diligence before finishing; plan phased completion.
- Sector F (Selective & Cautious):
- Favor 5- & 12-Marla on the clear side of the water body; expect phased earthwork → services → possession.
- Avoid/Defer 7-Marla opposite the water body until a formal relocation/compensation plan is announced.
- Sector G (Wait & Watch):
- Consider only clear pockets; otherwise defer until litigation is resolved or an official alternate-allocation program is offered.
- Access Advantage:
- Use the shorter 4.8–5 km route where open; monitor for continuous status.
- Factor in the future 400-ft corridor to M-2 that may compress internal travel to ~3 km once Sector-H linkages formalize.
- Portfolio Balance:
- For quicker habitation/resale, blend holdings with Sector A/B/C and Executive (esp. B), where build and possession are better.
Closing Note
The story across Overseas East Sectors E, F, G is mixed: E is largely clear with patchy villa progress, F is split by the water body with 7-Marla complications and slow villas, and G remains mostly litigated. Access is improving and should improve further with planned boulevards; however, title clearance and focused construction management are the decisive levers for near-term value.
If you need a street-wise due diligence report (maps, drone pins, buildability checks, and possession probability), we can prepare it for you.
Contact – Expert Help You Can Trust
Gains Real Estate and Marketing Pvt Ltd
- 📞 Call: 0335-5592930
- 💬 WhatsApp: wa.me/923355592930
- 🌐 Website: www.malikjunaid.com
We specialize in Capital Smart City sales, resale, construction facilitation, and relocation guidance for litigated pockets—especially for overseas clients who need verified, on-ground clarity.
One thought on “Capital Smart City – Overseas East (Sectors E, F, G)development status”
Add a Comment Cancel reply
Recent Posts
Master Plan (Map) of Faisal Town (Phase-II)
Overseas Central — Sector A | Big Roundabout Guide
All Categories
- 1 Kanal Balloted Plot for Sale – Overseas Central Sector C, Capital Smart City
- 1 Kanal Plot for Sale in Capital Smart City Phase 1 — Overseas Prime-1 Sector H (Access Road 1)
- 1 Kanal Plot in Capital Smart City Phase 1 – Overseas Prime 1 Block
- 1 Kanal plot in Overseas Prime 1
- 10 Marla 6-bedroom house for sale located in Capital Smart City – Overseas East Block C
- 10 Marla Plot for Sale Capital Smart City Islamabad Sector A Overseas East Block
- 10 Marla Plot for Sale in Executive West – Capital Smart City
- 10 Marla Villa for Sale – Capital Smart City Phase 1 (Overseas East)
- 2 Kanal Plot for Sale in Capital Smart City Overseas Prime 1
- 4 marla commercial plot for sale in Capital Smart City Overseas Central – Sector A
- 5 Marla Executive west G Block Plots for Sale in Capital Smart City phase 2
- 5 Marla Plot for Sale in Capital Smart City – Overseas East | Sector E
- 5 Marla Plot for Sale in Capital Smart City | Overseas East E Sector
- 5 Marla Plot in Executive 1 Sector C
- 5 Marla plot in Overseas East, Sector H, Street 6 Capital Smart City Phase 1
- 5 marla Residential Plot for Sale in Capital Smart City – Overseas West
- 7 Marla Corner Plot in Overseas Prime Block E – Fully Paid Prime Location Zero Dues!
- 7 Marla Plot for Sale – Capital Smart City Phase 1 Executive Block B
- 7 Marla Villa in Capital Smart City Overseas East Sector E
- 8 Marla Commercial Plot for Sale – Capital Smart City Overseas East phase 1
- blue world city
- Blue World City Islamabad: Navigating Installment Demands without NOC Approvals
- Capital Smart City – Executive Block (Phase 1): In‑Depth Guide to 5‑Marla Plots in Sectors B & C
- Capital Smart City – Overseas Central (Harmony Park) Sector H, Plot #36 | 3.5 Marla Fully Paid & Possession Ready
- Capital Smart City – Overseas East (Sectors E, F, G)development status
- Capital Smart City 14th August 2025 – A Grand Jashn-e-Azadi Celebration
- Capital Smart City 5 Marla House | Step-by-Step Construction Guide | Part 1: Taking Possession
- capital smart city interchange
- Capital Smart City Islamabad
- Capital Smart City Islamabad Construction bylaws Malik Junaid Gains Real Estate
- Capital Smart City Overseas Central Sectors E & B drone walkthrough 2025
- Capital Smart City Overseas East – Complete Guide, Updates, and Investment Insights
- Capital Smart City Overseas East | Sectors E, F & G
- Capital Smart City Overseas East drone update 2025
- Capital Smart City Overseas East Sectors A, K, J, B – Complete Tour & Plot Guide 2025
- Capital Smart City Payment Update & Limited-Time Discounts (Aug–Sept 2025): What Every Member Should Know
- Capital Smart City Phase 3 – Pre-Launch Residential Plots with Exclusive Discounted Payment Plan (4.5 Years Installments)
- Capital Smart City Phase 3 Booking
- Capital Smart City Phase 3 Launching Soon: Location, Prices & Investment Potential
- Capital Smart City Phase 3 NOC
- Capital Smart City Phase 3 vs Faisal Town Phase 2
- Capital Smart City Villa Apartments — FDH Special Relief & Escalation Discount Details (Sept 2025)
- Chahan Dam views in Capital Smart City (CSC)
- Commercial for sale in Capital Smart City Executive West
- complete society 4k drone view
- DHA Gandhara (DHA Phase 9 Islamabad) Drone Tour 4K | Location, Access & Latest Update
- DHA Phase 5 Islamabad
- Dha Phase 5 Islamabad Plot Prices
- Drone Footage of Capital Smart City Pakistan – Overseas East (Sector C)
- Drone Video Capital Smart City Overseas East Block
- Executive West Capital Smart City Phase 2 2025
- Executive West Development | Capital Smart City Phase 2 (September 2025)
- Explore E-18 & D-18 Islamabad – Gulshan-e-Sehat & Engineering Cooperative Housing Societies
- Faisal Town Islamabad
- Faisal Town Phase 2 master plan
- Faisal Town Phase 2 Sector 0
- Faisal Town Phase 2 Sector O: Plots, Prices & Guide
- Faisal Town Phase 2 Sports City 2, Sector I & J, Education District development update
- full society visit
- I-14, I-15, I-16 Islamabad
- Introducing DHA Gandhara Phase 9 Islamabad’s Next Landmark Destination
- Latest Plots for Sale in Capital Smart City Islamabad June 2025 Update
- New Booking for Overseas Central – Ready to Construct Residential Plots
- notifications
- Overseas Central Sector A B Capital Smart City 2025
- Overseas Central Sector A Big Roundabout Capital Smart City
- Overseas Central Sector E & F drone video
- Overseas Central Sector G Capital Smart City 2025
- Overseas East Ring Road & Access Roads to Overseas Prime – A Game-Changer in Connectivity (Sept 2025)
- Overseas East Sector H Capital Smart City drone 2025
- Overseas Prime 2 Capital Smart City Phase 2 2025
- Overseas Prime Sector H Capital Smart City
- Overseas Prime Sectors D E F Capital Smart City
- Park View City Islamabad
- Plot for sale Block B Executive 1 Street 3 Plot 17 Capital Smart City
- Plot for sale in Street No.06, Sector D (Overseas Prime) | Capital Smart City
- plots for sale in Capital Smart City Phase 2 – Overseas West.
- Prime-1 to Overseas East road Capital Smart City
- Rawalpindi Ring Road, RRR,
- Realtors Enclave & 400-ft Main Boulevard | Capital Smart City (Overseas Central) — 2025
- Restaurant
- Sector E Overseas Central Capital Smart City location
- Sector E, Overseas East: 5 Marla Plot for Sale
- Sector H Land Cutting Revealed! | Capital Smart City Overseas Prime Islamabad Progress
- Soil Testing Map Designing and Modern Construction Solutions in Capital Smart City by Gains Real Estate
- Top City Islamabad
- Uncategorized
- University Town Islamabad
- University Town Islamabad Office Sealed – What It Means for Plot Owners & Investors
- villas
- When Will Life Truly Begin in Capital Smart City Islamabad?
- Where Faisal Town Phase 2 meets Capital Smart City (Thalian Interchange, M-2 & RRR corridor)
- 🏡 12 Marla Corner Residential Plot for Sale in Capital Smart City – Overseas Central (Sector A)
Tags
Get Free Consultations
About your file or plot already purchased and what you want to do with it, get a free advice....
[…] Accessibility is a primary selling point. Capital Smart City sits adjacent to the Lahore–Islamabad (M-2) Motorway and benefits from planned and existing access routes that ease commutes between Islamabad, Rawalpindi and beyond. A newly opened access route (reported recently) shortens the driving distance from the Smart City interchange to the edge of Sector E to roughly 4.8–5.0 km — cutting previous travel distances almost in half compared to the older looped approaches through the 400-ft Boulevard and Overseas Prime routes. Reduced travel distance improves resale desirability and daily convenience for residents. If infrastructure continues to be upgraded, properties in these sectors stand to gain in liquidity and premium pricing. (Malikjunaid.com) […]